 Assessment of risks associated with Tailings Storage Facilities


 During FY 2023, we completed a   •  High: Actions should be implemented
 comprehensive assessment of all risks   within the next 6 months.
 associated with the storage and   •  Moderate: Actions should be
 management of tailings at all our sites. At the   reviewed by the EoR and
 site-level, this involved evaluating and   implementation coordinated by the
 analysing all potential risks through review of   RTDE, within the business planning
 the existing, site-level Tailings Management   cycle. Implementation should occur
 System (TMS), taking into account the   within the next 12 months.
 specific requirements outlined in the Global
 Industry Standard on Tailings Management   •  Low: Actions should be reviewed by
 (GISTM). The key aspects of the review relate   the EoR and implementation
 to the 6 broad areas and 15 principles related   coordinated by the RTDE, within the
 to the safe design and development,   business planning cycle.
 operation, emergency preparedness and   Implementation should occur within
 closure of TSF’s as defined in the GISTM. The   the next 24 months.
 desktop review then assessed the extent of
 implementation of the TMS at the site against   In addition to this standalone risk
 the specific requirements of the principles of   assessment, we also conduct regular
 the GISTM. Each requirement was then   audits of all our tailing dams in
 assigned scores on a scale of I (low) to IV   conformance with the performance
 (high).  standards established under the
 Vedanta Standard.
                Tailings Risk Potential FY 2023
 After the successful completion of this
 standalone risk assessment, we are better      Total Number   Number of facilities
 able to align our TMS with the GISTM   Managing slurry water for reuse and      of Facilities   categorized as
 methodology. Certain gaps have been   improved tailings compaction             "high risk potential"
                                                           ("extreme" and "very
 exposed as a result of this exercise, and to              high")
 help individual sites improve the TMS, certain   Tailing slurry consists of about 50-55%
 actions have been prioritized. Given below is   water, and at Hindustan Zinc Ltd, the dry   Active Facilities  16  1
 the priority ranking that will be followed to   tailing plant system allows the filtration   Inactive Facilities  9  0
 action the changes required:  process to lower the water content to   ( including facilities
 16%. The extracted water is then   in care maintenance
 •  Critical: Actions should be implemented   or closed)
 with urgency and outside of the usual   circulated into the milling operation,   Planned Facilities  0  0
 business planning cycle. Completion within   therefore reducing overall water
 90 days and with corporate oversight   consumption. The remaining slurry is then
 involved.  used for compaction and plantation.  Zero TSF failures (due to leakage, overflow, etc) in the past four years