         Assessment of risks associated with Tailings Storage Facilities


         During FY 2023, we completed a                                       •  High: Actions should be implemented
         comprehensive assessment of all risks                                  within the next 6 months.
         associated with the storage and                                      •  Moderate: Actions should be
         management of tailings at all our sites. At the                        reviewed by the EoR and
         site-level, this involved evaluating and                               implementation coordinated by the
         analysing all potential risks through review of                        RTDE, within the business planning
         the existing, site-level Tailings Management                           cycle. Implementation should occur
         System (TMS), taking into account the                                  within the next 12 months.
         specific requirements outlined in the Global
         Industry Standard on Tailings Management                             •  Low: Actions should be reviewed by
         (GISTM). The key aspects of the review relate                          the EoR and implementation
         to the 6 broad areas and 15 principles related                         coordinated by the RTDE, within the
         to the safe design and development,                                    business planning cycle.
         operation, emergency preparedness and                                  Implementation should occur within
         closure of TSF’s as defined in the GISTM. The                          the next 24 months.
         desktop review then assessed the extent of
         implementation of the TMS at the site against                        In addition to this standalone risk
         the specific requirements of the principles of                       assessment, we also conduct regular
         the GISTM. Each requirement was then                                 audits of all our tailing dams in
         assigned scores on a scale of I (low) to IV                          conformance with the performance
         (high).                                                              standards established under the
                                                                              Vedanta Standard.
                                                                                                                                       Tailings Risk Potential FY 2023
         After the successful completion of this
         standalone risk assessment, we are better                                                                                                              Total Number      Number of facilities
         able to align our TMS with the GISTM                                 Managing slurry water for reuse and                                               of Facilities     categorized as
         methodology. Certain gaps have been                                  improved tailings compaction                                                                        "high risk potential"
                                                                                                                                                                                  ("extreme" and "very
         exposed as a result of this exercise, and to                                                                                                                             high")
         help individual sites improve the TMS, certain                       Tailing slurry consists of about 50-55%
         actions have been prioritized. Given below is                        water, and at Hindustan Zinc Ltd, the dry                  Active Facilities      16                1
         the priority ranking that will be followed to                        tailing plant system allows the filtration                 Inactive Facilities    9                 0
         action the changes required:                                         process to lower the water content to                      ( including facilities
                                                                              16%. The extracted water is then                           in care maintenance
         •  Critical: Actions should be implemented                                                                                      or closed)
           with urgency and outside of the usual                              circulated into the milling operation,                     Planned Facilities     0                 0
           business planning cycle. Completion within                         therefore reducing overall water
           90 days and with corporate oversight                               consumption. The remaining slurry is then
           involved.                                                          used for compaction and plantation.                      Zero TSF failures (due to leakage, overflow, etc) in the past four years