48     Energy in action






            Operational Efficiency At STPL (Transmission)








            Apraava Energy is                                                          Figure 12: System Availability (%)

            constantly working to                                                       120%

            improve its O&M standards                                                   100%    99.996%      99.996%

            by ensuring that the                                                        80%
                                                                                        60%
            performance of its                                                          40%

            transmission assets is in                                                    20%
                                                                                         0%
            line with business                                                                 FY 2019-20   FY 2020-21

            objectives. To gain better                                       attended to during opportunity shutdown while

            operational control of our                                       non-shutdown findings are rectified on the same day
                                                                             during patrolling.
            asset, we have put                                               We perform third-party audits of the transmission system

            together a strategy that is                                      and its compliance on a regular basis, as well as joint
                                                                             inspections of all railway crossings. We have
            in line with our operative                                       implemented ISO 9001:2015 and ISO 45001:2018 quality
                                                                             and safety management systems to ensure effective
            philosophy of ‘preventive                                        safety and quality management. Quality and safety
                                                                             management have been implemented in accordance
            maintenance.’                                                    with ISO 9001:2015 and ISO 45001:2018 standards.


            Effective functioning of the transmission system                 Satpura Transco Private Limited (STPL), acquired in
            entails regular monitoring and review of O&M                     November 2019, is using a mobile application named NAINA.
            processes. Routine patrolling of transmission lines is
            conducted as part of standard operating procedure.               The NAINA has inbuilt features for GPS co-ordinates and a
            Any unwarranted changes observed are categorised                 checklist where one can record observations and upload
            as shutdown & non-shutdown.  Of these, shutdown                  information which allows for remote monitoring of
            related observations are separately identified and                inspection status carried out by STPL O&M team.