Page 46 - Apraava Energy Report_01-73
P. 46
46 Energy in action
Operational Efficiency in Renewable Energy
Initiatives for maximising efficiency
Solar assets Wind assets
Solar operational initiatives: Wind operational initiatives:
• Construction of rain water harvesting • Generator water ingress prevention by drain sleeve retrofitting
structures and desilting of natural dam • Blade skirt internal sealing to prevent ingress into the nacelle
at Sakri
• Lightning spikes retrofitted on 33 KV poles
Solar operational initiatives under • Retrofitting of dual Lightening Arrestor (LA) in Vacuum Circuit Breaker
execution:
(VCB) yard of the Wind Turbine Generators (WTG)
• Implementation of reactive power • Printed Circuit Board (PCB) varnishing in sites prone to extreme
compensator to limit reactive power moist conditions
injection to the grid (to adhere to
regulations) & improve Power Factor • 100% blade cleaning and repair activity at Khandke wind farm
(PF) at all solar assets
Completed wind operational initiatives/ those under execution:
• DC capacity augmentation at Sakri by
installing Photo Voltaic (PV) modules. • Vortex Generator (VG) strip installation to increase performance of
Land and inverter inputs in place turbine by recovering aerodynamic performance of blades lost due to
erosion and dust accumulation
• Rain water harvesting wells initiated at
CREPL & DSPL sites • Installation of power boost, which makes use of inherent design margin
to increase the rating of generator
• Installation of Central Lubrication System (CLS) which is a new ‘parallel’
type, replacing existing single point lubricators to prevent ‘under/over’
lubrication besides reducing the disposal of toxic metallic waste
• Detection of dynamic pitch and yaw misalignment using lidar to correct
errors in measurement
• High resolution wind measurement and direction sensor installation in
S97 (Suzlon) make turbines
• Installation of fire protection system at Tejuva wind farms
• Supervisory control and data acquisition (SCADA) upgrade at Hara wind
farm and new SCADA configuration at Theni & Khandke wind farms