Page 49 - Apraava Energy Report_01-73
P. 49

Apraava Sustainability Report 2020-2021  49






            Stepping Stones for Aiding Operational Excellence at STPL












                                                                Regular patrolling of
                                                               entire transmission line




                                                                                             Regular audit of
                                       Use of mobile
                                     application named                  1                 transmission system by
                                      NAINA for tower                                    independent engineer (IE)
                                         inspection
                                                        7                                2









                               Tower footing                                                           Regular joint
                             resistance (once in    6                                        3        inspection of all
                                a year) of all                                                       railway crossings
                                  towers



                                                               5                 4




                                               Thermal scanning (once             ISO 9001:2015 &
                                                 in a year) for every           ISO 45001:2018 audit
                                                midspan joints, jumper            of documents &
                                                and for repair sleeves          transmission system
   44   45   46   47   48   49   50   51   52   53   54