Page 49 - Apraava Energy Report_01-73
P. 49
Apraava Sustainability Report 2020-2021 49
Stepping Stones for Aiding Operational Excellence at STPL
Regular patrolling of
entire transmission line
Regular audit of
Use of mobile
application named 1 transmission system by
NAINA for tower independent engineer (IE)
inspection
7 2
Tower footing Regular joint
resistance (once in 6 3 inspection of all
a year) of all railway crossings
towers
5 4
Thermal scanning (once ISO 9001:2015 &
in a year) for every ISO 45001:2018 audit
midspan joints, jumper of documents &
and for repair sleeves transmission system